Skip to content

Read at

A snapshot: read at commit 707a04c7ce8 on 2026-10-18T00:01:48Z by majordomus 0.29.0. Nothing on this page is read again. See it live

PR Drain

Pull requests converging on master, one at a time.

Every open pull request as the integration lane assessed it: what it waits for, what would move it, what it depends on and overlaps, and the issue it carries.

  • Issues ready86plan.status /counts/by_status/READY
  • Issues active1plan.status /counts/by_status/ACTIVE
  • Issues blocked159plan.status /counts/by_status/BLOCKED
  • Issues done161plan.status /counts/by_status/DONE

Issue

One issue of the plan, as the plan records it.

I2703 · runtime-trust · p1 · wave 1

The mesh cooperation rule lists the hello checks in the order the code runs them, and a test names that order

blockedPull requests that name itClose

Bring rule project.mesh-cooperation-is-authenticated to the check order accept_hello runs, with the nonce cache last and the recipient check before it, as a new version of the blocking rule, and hold the code to it with a test.

Depends on
I2132
Blocked by
I2132
Unblocks
none
Serves
none
Scope
.ai/repo/rules/projectscripts/ci/mesh-checktest/cases/301_the_mesh_stays_one_subsystem.shapps/majordomus-cli/src/mesh/cooperation.rsapps/majordomus-cli/tests/mesh_cooperation.rsdocs/MESH.md
Evidence
0 of 1
Started
not yet
Verified
not yet
Completed
not yet

plan.issues0 msAPI/api/v1/plan/issuesMCPmajordomus_plan_issuestechnical view

Pull-request drain

The integration lane asks the forge for every open pull request; this takes a while and arrives after the screen.