Přeskočit na obsah

Tato stránka byla automaticky přeložena z angličtiny, jediného jazyka, ve kterém se tento web píše. Číst originál.

I3751 — The roadmap says only what the plan holds, with a bar and a date on every milestone

Make /roadmap/ and its Czech copy state only what the plan and the history hold: every milestone with required issues draws a bar of its accepted issues against the ones it requires, every milestone shows the date of the release that carried it or of its last delivered issue, the share of milestones that depend on another is counted rather than asserted, and a milestone accepted with no issues reads as delivered.

PŘIPRAVENO vlna 0 · p1 · profil implementation · bezpečné paralelně

Součást truthful-plan-surfaces — Povrchy plánu se odvozují z dodávky a nic, co zobrazují, se nezadává vedle repozitáře.

Připraveno. Všechny závislosti jsou hotové, takže majordomus plan start I3751 bude přijato.

Cíl

Make /roadmap/ and its Czech copy state only what the plan and the history hold: every milestone with required issues draws a bar of its accepted issues against the ones it requires, every milestone shows the date of the release that carried it or of its last delivered issue, the share of milestones that depend on another is counted rather than asserted, and a milestone accepted with no issues reads as delivered.

Proč

Found on 2026-10-20 by the owner-ordered audit of /roadmap/ (campaign defect D5), and decided by the owner the same day: dates and progress bars on every surface. The page said that each milestone depends on the ones before it, while 72 of 100 depend on nothing; that each milestone names a claim, while 5 do; that there is no progress bar because a full bar would be a lie, while /ui/roadmap/ draws bars; and foundation read DONE beside 'no issues written yet'. No milestone said when anything happened.

Aktuální stav

site/templates/roadmap.html draws per milestone the release label, the status, the blocked-by line and the counts 'done N of M', and nothing on when. Its closing paragraph asserts 'Each milestone depends on the ones before it' and that 'there is no percentage anywhere on this page'. site/content/roadmap.md says 'there is no progress bar on this page' and 'Each milestone names the claim it would move out of planned'. The issueless milestone branch prints 'no issues written yet' whatever the status. The dates exist: site/static/releases/<tag>.json carries published_at, and site/data/generated/delivery.json carries merged.merged_at per issue.

Cílový stav

Each milestone with required issues draws a native progress element (value: accepted issues, max: required issues, cancelled ones left out, the same count as 'done N of M'). Each milestone shows 'released <date>' from its release record, or 'last delivery <date>' from the latest merged_at of its issues, or says it has no delivery date or nothing delivered. The closing paragraph counts the milestones that depend on another from roadmap.json. An accepted milestone with no issues reads delivered. The numbers and dates are opaque to the translation pass, so the Czech copy needs one segment per sentence, not one per number, and the Czech memory carries each new sentence.

Rozsah

  • site/templates/roadmap.html
  • site/content/roadmap.md
  • site/i18n/cs/memory
  • test/cases/3724_the_roadmap_says_what_the_plan_holds.sh

Mimo rozsah

  • The /ui/roadmap/ meters, which are I3440's
  • Translating the rest of the roadmap's missing Czech segments, which the multilingual work owns

Závislosti

Žádné. Tento úkol je kořenem grafu.

Co na tom čeká

Kritéria přijetí

  • Every milestone of roadmap.json with required issues has one bar whose value and max equal its done and required counts
  • A milestone carried by a release shows that release's published_at date; an unreleased one with merged issues shows the latest merged_at of its issues
  • The closing paragraph's count equals the number of milestones in roadmap.json with a non-empty depends_on
  • An accepted milestone with no issues reads delivered, not 'no issues written yet'
  • Negative: the rendered page carries none of the withdrawn sentences ('depends on the ones before it', 'no progress bar', 'would be a lie')
  • The Czech memory holds a translation for each new sentence, and no new segment carries a number or a date in its key

Validace

  • bash test/run.sh 3724_the_roadmap_says_what_the_plan_holds 3103_the_roadmap_draws_every_milestone
  • scripts/site-build && scripts/site-check
  • majordomus plan validate

Požadované důkazy

  • test_the_roadmap_says_what_the_plan_holds

Důkazy

Nic nezaznamenáno. Za každým tokenem výše musí stát příkaz nebo artefakt, než lze tento úkol dokončit; vyprávění se odmítá.

Časová osa

zahájeno
—
ověřeno
—
dokončeno
—

Tato tři pole, důkazy výše a stav závislostí jsou vše, z čeho se stav skládá. Neexistuje žádné pole stavu, které by s nimi mohlo být v rozporu.

Canonical record: .ai/repo/project/issues/I3751.yaml. Read it back with majordomus plan show I3751.

Prohledává názvy a popisy všech stránek, které tento web publikuje.