Issue and milestone status is derived from recorded facts and is stored nowhere

There is no status: field in an issue or a milestone. Writing one is an unknown key. An issue records what happened to it — started_at, verified_at, completed_at, cancelled, and its evidence — and BLOCKED, READY, ACTIVE, VERIFY, DONE or CANCELLED follows from those facts together with the state of the issues it depends on. A milestone's status follows from its issues and its own evidence.

guaranteed Deterministic and blocking. Implemented, and a behavioural test proves it.

An issue records started_at, verified_at, completed_at, cancelled and its evidence. BLOCKED, READY, ACTIVE, VERIFY, DONE and CANCELLED follow from those and from the state of its dependencies. `status` is not a field, so writing one is an unknown key.

What it means

There is no status: field in an issue or a milestone. Writing one is an unknown key. An issue records what happened to it — started_at, verified_at, completed_at, cancelled, and its evidence — and BLOCKED, READY, ACTIVE, VERIFY, DONE or CANCELLED follows from those facts together with the state of the issues it depends on. A milestone's status follows from its issues and its own evidence.

How it works

lib/project.awk computes, for each issue, whether it is locally done (completed, not cancelled, every required evidence token covered), then whether any dependency is not done. The precedence is cancelled, done, verify, active, blocked, ready. A milestone is DONE only when every issue that is not cancelled is DONE and its own evidence_required is covered; when the issues are all done and the milestone's evidence is not, it is VERIFY. The active milestone is the lowest-ordered milestone that is ACTIVE, or failing that the lowest-ordered one that is not finished.

How to see it

majordomus plan list
# I0002   BLOCKED   1    M000   Define the canonical milestone and issue schema
majordomus plan done I0001
# plan: I0001 DONE
# next ready issue: I0002

What it does not cover

Derivation cannot tell you that a recorded fact is false. If completed_at is set on an issue whose work was never done, the graph believes it — which is why plan done refuses without evidence, and why the evidence has to be a command.

Why it exists

A stored status is a second opinion. The moment it can disagree with the dependency graph, somebody has to decide which one is right, and the answer is always the graph.

Detail rendered from docs/claims/project-status-derived.md.

Provenance

defined in
read it on this site · docs/PLANNING.md
implemented in
lib/project.awk
proved by
test/cases/41_project_status.sh
claim id
project-status-derived

Verify it yourself

The test runs in a disposable temporary repository and asserts the behaviour, not a string in the source.

from a clone of the repository
bash test/run.sh 41_project_status

Where this claim is used

Related claims same implementation

The moments this answers