I0001 — Audit what actually plans work in this repository
Establish an evidence-backed map of how work is currently planned, tracked and remembered here, so that the model that replaces it is built against reality rather than against the README.
DONE wave 0 · p0 · deep-work profile · parallel safe
Part of M000 — Milestone and DAG driven development.
Objective
Establish an evidence-backed map of how work is currently planned, tracked and remembered here, so that the model that replaces it is built against reality rather than against the README.
Why
Every later issue depends on knowing what already exists. The repository already has a canonical-to-derived architecture for claims, doctrines and the website; a planning model that ignored it would be a second architecture.
Current state
Planning lived in task records, handovers, checkpoints and decisions. GitHub had no milestones and no issues. There was no dependency relation between pieces of work anywhere.
Desired state
The current-state map exists, backed by commands anyone can rerun, and the schema work that follows cites it.
Scope
- docs
Out of scope
- Any change to behaviour
Dependencies
None. This issue is a root of the graph.
What waits on this
Acceptance criteria
- The GitHub milestone and issue inventory is measured, not assumed
- The existing canonical-to-derived pipeline is identified so the new model reuses it
- The portability constraints that bound the implementation are named
Validation
- gh issue list --state all
- gh api repos/korczis/prismatic-majordomus/milestones
Evidence required
- inventory
Evidence
| covers | type | command | result | at commit |
|---|---|---|---|---|
| inventory | manual | gh issue list --state all --limit 50; gh api repos/korczis/prismatic-majordomus/milestones | both empty: the repository had no GitHub issues and no milestones before this milestone | 60f83e3 |
Risk
Low. Read-only.
Timeline
- started
- 2026-09-04T02:54:00Z
- verified
- 2026-09-04T02:54:01Z
- completed
- 2026-09-04T02:54:02Z
Those three fields, the evidence above and the state of the dependencies are all the status is made of. There is no status field to disagree with them.