I0843 — The performance workflow is discoverable and complete

Close the milestone: every acceptance criterion of M004 has evidence, the README workflow runs as written, the site is regenerated, and the final report is a plan record rather than a conversation.

BLOCKED wave 6 · p0 · implementation profile · runs alone

Part of M004 — Performance is executable evidence, and the hot path does no canonical work twice.

Blocked. This issue cannot start until I0831, I0835, I0841, I0842 are done. The status is derived from that, not declared.

Objective

Close the milestone: every acceptance criterion of M004 has evidence, the README workflow runs as written, the site is regenerated, and the final report is a plan record rather than a conversation.

Why

A milestone is accepted by its evidence, not by finishing its issues.

Current state

Open.

Desired state

M004 accepted with evidence on every criterion.

Scope

  • docs/PLAN_STATUS.md
  • .ai/repo/project

Dependencies

Acceptance criteria

  • plan validate passes and M004 reports every evidence_required token satisfied

Validation

  • bin/majordomus plan validate
  • bin/majordomus plan status

Evidence required

  • docs_integrated

Evidence

None recorded. Every token above needs a command or an artifact behind it before this issue can be completed; narrative is refused.

Risk

The last issue is the one that checks the others honestly.

Timeline

started
verified
completed

Those three fields, the evidence above and the state of the dependencies are all the status is made of. There is no status field to disagree with them.

Canonical record: .ai/repo/project/issues/I0843.yaml. Read it back with majordomus plan show I0843.