I1030 — The milestone is accepted on its evidence

Close the milestone: every acceptance criterion carries evidence, the measurements are recorded with their environment, the contributor workflow runs as written, and the remaining gaps are stated.

BLOCKED wave 7 · p0 · implementation profile · runs alone

Part of capability-graph — One capability graph, two projections, and no second inventory of what this repository can do.

Blocked. This issue cannot start until I1010, I1013, I1017, I1020, I1024, I1026, I1027, I1028, I1029 are done. The status is derived from that, not declared.

Objective

Close the milestone: every acceptance criterion carries evidence, the measurements are recorded with their environment, the contributor workflow runs as written, and the remaining gaps are stated.

Why

A milestone is accepted by its evidence. What a later reader has is the record, not this session.

Current state

Open.

Desired state

Accepted with evidence against every criterion, with the coverage baseline and the limitations written where they will be found.

Scope

  • docs/PLAN_STATUS.md
  • .ai/repo/project

Out of scope

  • Reporting a derived surface as proved without the artifact that proves it

Dependencies

Acceptance criteria

  • Every acceptance criterion of the milestone has evidence recorded against it
  • The coverage matrix baseline is recorded as a starting measurement rather than presented as a verdict
  • The contributor workflow runs exactly as documented on a clean checkout
  • Pre-existing failures, failures introduced here and failures fixed here are distinguished explicitly
  • Remaining limitations are stated rather than omitted

Validation

  • bash test/run.sh
  • bin/majordomus doctor
  • majordomus generate --check

Evidence required

  • criteria_covered
  • baseline_recorded
  • limitations_stated

Evidence

None recorded. Every token above needs a command or an artifact behind it before this issue can be completed; narrative is refused.

Risk

The end of a large milestone is where intent gets recorded as outcome. Anything not demonstrated is written as a limitation.

Timeline

started
verified
completed

Those three fields, the evidence above and the state of the dependencies are all the status is made of. There is no status field to disagree with them.

Canonical record: .ai/repo/project/issues/I1030.yaml. Read it back with majordomus plan show I1030.