A snapshot: read at commit 707a04c7ce8 on 2026-10-18T00:01:48Z by majordomus 0.29.0. Nothing on this page is read again. See it live
PR Drain
Pull requests converging on master, one at a time.
Every open pull request as the integration lane assessed it: what it waits for, what would move it, what it depends on and overlaps, and the issue it carries.
- Issues ready86plan.status /counts/by_status/READY
- Issues active1plan.status /counts/by_status/ACTIVE
- Issues blocked159plan.status /counts/by_status/BLOCKED
- Issues done161plan.status /counts/by_status/DONE
Issue
One issue of the plan, as the plan records it.
I1954 · test-evidence · p1 · wave 2
Every runner reaches the ledger, through the recording branch
Wire the trunk's runs to the recording branch of ADR 0080 and every runner to a measured report, so that a merge to master is followed by one recording pull request that changes only the ledger (ADR 0087 decisions 1, 6 and 16).
plan.issues0 msAPI/api/v1/plan/issuesMCPmajordomus_plan_issuestechnical view
Pull-request drain
The integration lane asks the forge for every open pull request; this takes a while and arrives after the screen.