Přeskočit na obsah

Tato stránka byla automaticky přeložena z angličtiny, jediného jazyka, ve kterém se tento web píše. Číst originál.

operation-convergence — After the alpha, the time from an intent to its verified satisfaction is measured from the records

Intent-to-verified-done, interventions, replans, governance time and rework are derived per intent from git history and the evidence ledger, and the with/without comparison is read from matched benchmark runs behind ADR 0082's rule.

BLOKOVÁNO 0 of 1 issues done

připraveno
0
blokováno
1
aktivní
0
verify
0
hotovo
0
zrušeno
0

Problém

The method's value is asserted, not measured: nothing derives how long an intent takes from its proposal to a verified verdict, or what governance and rework it cost, and the alpha's conditions are recorded only as invariants of the intent. Sources: chatgpt-majordomus:c147#7, chatgpt-majordomus:c198#15, chatgpt-majordomus:c221#4, chatgpt-majordomus:c270#8, chatgpt-majordomus:c275#25, chatgpt-majordomus:c286#21.

Výsledek

Intent-to-verified-done, interventions, replans, governance time and rework are derived per intent from git history and the evidence ledger, and the with/without comparison is read from matched benchmark runs behind ADR 0082's rule.

Aktuální stav

cost-per-accepted-outcome (I0401-I0404) measures tasks, not intents, and reads BLOCKED behind execution-telemetry. The alpha's conditions (green tag commit, pre-release isolation, clean install, refusal at finish, the IDD case, compute labelled experimental) are invariants of operation-convergence carried by work outside this milestone (I2829, I2812 and cases 1024 and 3220, on branches or in the 0.30.0 top), and this milestone does not judge them.

Cílový stav

I3276 lands and the criterion the-method-is-measured-after-the-alpha is rebound to its test and reads current from it.

Rozsah

  • apps/majordomus-cli/src/economics
  • apps/majordomus-cli/tests/economics.rs
  • docs/ECONOMICS.md

Mimo rozsah

  • Verifying the alpha conditions on the tag commit; the release seat owns that verdict
  • Running the matched benchmark itself (I3133)

Kritéria přijetí

  • Time from intent to verified satisfaction, governance time, tokens and rework are derived for matched tasks with and without Majordomus, and published only past ADR 0082's rule

Validace

  • majordomus plan validate

Rizika

  • The criterion stays a command placeholder until I3276 writes its test; until I3255 refuses a criterion's own explain as proof, one explain run could read it current

Úkoly

Každý z nich je prováděcí kontrakt s vlastními kritérii přijetí, validačním příkazem a požadovanými důkazy. Sloupec wave je vrstva grafu závislostí, v níž úkol leží.

issuestatusvlnazávisí nanázev
I3276 BLOKOVÁNO 3 I3255, I0403, I3133 The time from an intent's proposal to its verified satisfaction is derived from the records, with the interventions on the way

Graf

operation-convergence dependency graphz .ai/repo/project
flowchart LR
    I3276["I3276<br/>The time from an intent's proposal to its verified satisfaction is derived from the records, with the interventions on the way"]:::blocked
    classDef done stroke:#16a34a,fill:#dcfce7,color:#14532d,stroke-width:2px
    classDef active stroke:#2563eb,fill:#eff6ff,color:#1e3a8a,stroke-width:2px
    classDef verify stroke:#7c3aed,fill:#f5f3ff,color:#4c1d95,stroke-width:2px
    classDef ready stroke:#0891b2,fill:#ecfeff,color:#164e63,stroke-width:2px
    classDef planned stroke:#0891b2,fill:#ecfeff,color:#164e63,stroke-width:2px
    classDef blocked stroke:#b45309,fill:#fffbeb,color:#78350f,stroke-width:2px
    classDef cancelled stroke:#6b7280,fill:#f9fafb,color:#374151,stroke-width:2px
    classDef superseded stroke:#6b7280,fill:#f9fafb,color:#374151,stroke-width:2px

Canonical record: .ai/repo/project/milestones/operation-convergence.yaml. Read it back with majordomus plan show operation-convergence.

Prohledává názvy a popisy všech stránek, které tento web publikuje.