Skip to content

I1123 — The milestone is accepted on its evidence

Close the milestone: every acceptance criterion carries evidence, the measured baselines are recorded with the environment they were taken on, the adoption and removal run as documented on a clean checkout, and the remaining limitations are stated.

BLOCKED wave 8 · p0 · implementation profile · runs alone

Part of two-folder-integration — A repository that adopts Majordomus gains two directories and two lines, and can give them back.

Blocked. This issue cannot start until I1104, I1107, I1115, I1117, I1118, I1119, I1120, I1122 are done. The status is derived from that, not declared.

Objective

Close the milestone: every acceptance criterion carries evidence, the measured baselines are recorded with the environment they were taken on, the adoption and removal run as documented on a clean checkout, and the remaining limitations are stated.

Why

A milestone is accepted by its evidence. What a later reader has is the record, not this session.

Current state

Open.

Desired state

Accepted with evidence against every criterion, with the footprint, the budgets and the limitations written where they will be found.

Scope

  • docs/PLAN_STATUS.md
  • .ai/repo/project

Out of scope

  • Reporting a mechanism as proved without the artifact that proves it

Dependencies

Acceptance criteria

  • Every acceptance criterion of the milestone has evidence recorded against it
  • The measured footprint of an adoption is recorded — every path, with its namespace and its owner
  • The budgets are recorded with the machine and environment they were measured on
  • The documented adoption and removal run exactly as written on a clean checkout
  • Pre-existing failures, failures introduced here and failures fixed here are distinguished explicitly
  • Remaining limitations are stated rather than omitted

Validation

  • bash test/run.sh
  • bin/majordomus doctor
  • majordomus generate --check

Evidence required

  • criteria_covered
  • footprint_recorded
  • limitations_stated

Evidence

None recorded. Every token above needs a command or an artifact behind it before this issue can be completed; narrative is refused.

Risk

The end of a long milestone is where intent gets recorded as outcome. Anything not demonstrated is written as a limitation.

Timeline

started
verified
completed

Those three fields, the evidence above and the state of the dependencies are all the status is made of. There is no status field to disagree with them.

Canonical record: .ai/repo/project/issues/I1123.yaml. Read it back with majordomus plan show I1123.